    뉴스 및 이벤트
    AISOAR New Factory Update: 385-Meter Automatic Spray Painting Line for Hydraulic Cylinders

    목차

    토글
    • Why We Upgraded the Painting Line
    • Key Upgrades to the New Automatic Spray Painting Line
      • A Longer Pretreatment Section for a Cleaner Surface
      • More Uniform Automatic Spray Painting
      • Primer + Topcoat for Different Protection Requirements
      • 70-Meter Curing Oven
      • Flexible Color Changes for OEM Production
      • Higher Continuous Production Capacity
    • What the Upgrade Means for Our Customers
    • Visit AISOAR’s New Factory

    AISOAR New Factory Update: 385-Meter Automatic Spray Painting Line for Hydraulic Cylinders

    3일 11월 2026

    As part of AISOAR’s new factory upgrade, a 385-meter automatic spray painting line for hydraulic cylinders has been built to improve coating consistency and support higher-volume production.

    The new line integrates surface pretreatment, automatic spraying, curing and continuous conveying. Key upgrades include a 48-meter cleaning section, 80%–90% paint transfer efficiency, a 70-meter curing oven, and a production capacity of approximately 1,200 hydraulic cylinders per 8 hours.

    AISOAR New Factory


    목차

    토글
    • Why We Upgraded the Painting Line
    • Key Upgrades to the New Automatic Spray Painting Line
      • A Longer Pretreatment Section for a Cleaner Surface
      • More Uniform Automatic Spray Painting
      • Primer + Topcoat for Different Protection Requirements
      • 70-Meter Curing Oven
      • Flexible Color Changes for OEM Production
      • Higher Continuous Production Capacity
    • What the Upgrade Means for Our Customers
    • Visit AISOAR’s New Factory

    Why We Upgraded the Painting Line

    For hydraulic cylinders, painting is not only about appearance. Surface cleanliness, paint coverage, coating thickness and curing all affect the consistency and quality of the finished surface. At the same time, higher production volumes require a painting process that can deliver stable results across larger batches.

    The new line was therefore developed around two priorities: more consistent coating quality and stronger production capacity. As production capacity expands at AISOAR’s new factory, the painting process also needs to support larger batches while maintaining consistent surface quality across different cylinder sizes and OEM requirements.

    AiSOAR Painting Line

    Key Upgrades to the New Automatic Spray Painting Line

    The new painting line combines longer pretreatment and curing sections, higher paint transfer efficiency, flexible color changes and increased production capacity.

    Upgrade New Painting Line
    Total line length 385 m
    Cleaning section 48 m
    Paint transfer efficiency 80%–90%
    Curing oven 70 m
    Load per hanging point 100 kg
    용량 1,200 cylinders / 8 h
    Capacity increase +33%
    Color change As fast as 10 min

    A Longer Pretreatment Section for a Cleaner Surface

    Good coating starts before the paint is applied.The new line includes a 48-meter cleaning and pretreatment section, with pre-cleaning, pre-degreasing, main degreasing, multiple rinsing stages and silane treatment. The extended cleaning process helps remove oil and other surface residues before spraying, providing a cleaner base for the following coating process.

    More Uniform Automatic Spray Painting

    The spraying section uses automatic high-speed rotary electrostatic spraying.

    Through fine atomization and electrostatic attraction, the paint is distributed more evenly across the cylinder surface. The paint transfer efficiency is approximately 80%–90%, helping improve coating uniformity and the final surface finish.

    For grooves, corners, weld areas, cylinder ends and other difficult-to-reach areas, manual touch-up is carried out after automatic spraying to reduce missed areas and locally thin coatings.

    Primer + Topcoat for Different Protection Requirements

    AISOAR hydraulic cylinders use a primer + topcoat coating system.

    For standard hydraulic cylinders, the total coating thickness is approximately 40 μm. For outdoor applications or products requiring higher surface protection, the total coating thickness can reach approximately 60 μm.

    A dedicated coating thickness gauge is used after painting to check the actual film thickness.

    70-Meter Curing Oven

    After spraying, the cylinders move through a 70-meter curing oven.

    The longer curing section provides more time and space for a stable curing process, helping improve the consistency and final quality of the coating.

    Flexible Color Changes for OEM Production

    The new spray painting equipment can support different customer colors without being limited to a fixed number of color options. A typical color change takes approximately 10–20 minutes, while an experienced operator can complete the change in as little as 10 minutes. This gives AISOAR greater flexibility when producing hydraulic cylinders for different OEM brands, product models and market requirements.

    Higher Continuous Production Capacity

    The complete painting line uses a high-load forged-chain conveyor system, with a load capacity of up to 100 kg per hanging point.

    The new line is designed to paint approximately:

    1,200 hydraulic cylinders per 8 hours

    Compared with the previous painting line, overall production capacity has increased by approximately 33%. This allows AISOAR to support larger production batches while maintaining a more consistent painting process.


    What the Upgrade Means for Our Customers

    For customers, the new painting line means more consistent coating quality across larger production batches, greater flexibility for OEM colors and product variations, and stronger capacity to support high-volume hydraulic cylinder orders.

    By improving both surface finishing and production efficiency, AISOAR can better support OEM customers who require stable quality, flexible customization and reliable volume production.


    Visit AISOAR’s New Factory

    As the new factory continues to expand its manufacturing capabilities, AISOAR will share more updates on machining, assembly, testing, coating and quality control. If you are planning to visit China, we welcome you to visit AISOAR’s new factory and see our hydraulic cylinder manufacturing and automatic spray painting line in person. Bring your drawings, equipment photos or project requirements, and our team can discuss your application with you during the visit.

    제품 추천

    TR 타이로드 유압 실린더

    모든 제품, 표준 유압 실린더
    스위블 볼 유압 실린더 제조업체

    스위블 볼 엔드 마운트가 장착된 WCS 용접형 실린더

    모든 제품, 표준 유압 실린더

    OEM 맞춤형 용접 유압 실린더

    모든 제품, OEM 맞춤형 유압 실린더

    지금 견적 받기


      회사

      중국 저장성 항저우시 빈장구 창허거리 강남대로 588호 헝신 맨션, 항저우, 저장성, 중국

      연락처

      +86-571-87920309
      [email protected]

      팔로우하기

      Facebook
      인스타그램
      LinkedIn

      주요 제품

      • 표준 유압 실린더
      • OEM 맞춤형 유압 실린더
      • 유압 시스템
      • 유압 테스트 기계
      • 유압 부품

      Aisoar © 2026. 모든 권리 보유.

      WhatsApp
      이메일
      이 웹사이트는 사용자 경험을 개선하기 위해 쿠키를 사용합니다. 이 사이트를 계속 사용하면 쿠키 사용에 동의하는 것입니다. 개인정보 보호정책